Edging your driveway and street not only enhances your home's curb appeal but also provides essential functionality by defining boundaries and preventing erosion. For homeowners in Atlanta, GA, understanding the potential costs involved is key to effective budgeting and comparing quotes. The typical cost for edging a drive and street in Atlanta, GA, generally falls between $5–$18 per linear foot, including installation. This range covers a variety of materials and complexities commonly chosen by homeowners.
While most homeowners will find their projects within this typical range, the full spectrum of pricing can swing from as low as $2 per linear foot for very basic options to as much as $40 per linear foot for high-end, custom solutions. These variations depend heavily on the materials chosen, the complexity of the design, and the specific labor required for installation. By understanding these factors, you can make an informed decision that best suits your aesthetic preferences and budget.
Cost Comparison
| Tier | Price Range | What's Included |
|---|---|---|
| Basic | $2–$8.8 per linear foot | Basic landscape edging or simple concrete curbing without special finishes. |
| Mid-range | $8–$18 per linear foot | Typical driveway and street edging including installation with standard materials. |
| Premium | $20–$40 per linear foot | High-end concrete curbing, such as stamped or colored concrete, for a custom aesthetic. |
Labor Costs
| Service Type | Average Hourly Rate |
|---|---|
| General Edging Labor | $85 per hour |
| Edging with Heavy Equipment | $150+ per hour |
| Standard Installation | Included in typical cost range of $5–$18 per linear foot |
| Basic Landscape Edging | Often priced per linear foot, ranging from $2–$8.8 per linear foot, including labor |
| Concrete Curbing Installation | Typically $4.80 to $5.60 per linear foot, including labor and material |
Key Cost Factors
- Material Selection: The type of material chosen for your edging significantly impacts the cost. Basic plastic or simple concrete is far less expensive than elaborate natural stone, stamped concrete, or colored concrete options.
- Linear Footage: The total length of the edging project is a primary cost driver. The longer the run, the higher the overall cost will be, though sometimes longer projects may receive a slightly lower per-linear-foot rate.
- Design Complexity: Custom shapes, intricate curves, and multi-level designs require more time and specialized skill, increasing labor costs compared to straight, simple edging.
- Site Preparation: Costs can increase if extensive preparation is needed, such as removing existing edging, grading the area, or dealing with difficult terrain.
- Geographic Location: While our guide focuses on Atlanta, costs can vary even within the metro area. Fuel costs, local labor rates, and the accessibility of materials can influence final pricing.
Regional Pricing
| Location | Typical Cost Per Linear Foot |
|---|---|
| Atlanta, GA | $5–$18 |
| United States (National) | $5–$18 |
| Dacula, GA | $8–$28 |
Tips for Hiring
- Get Multiple Quotes: Always gather at least three detailed quotes from different contractors. This allows you to compare pricing, materials, and proposed work, ensuring you get the best value for your project.
- Check for Licensing and Insurance: Verify that the contractor is properly licensed and insured in Georgia. This protects you from liability in case of accidents or damage during the project.
- Review Portfolios and References: Ask to see examples of their previous work or speak with past clients. This can give you insight into their quality of craftsmanship and customer satisfaction.
- Clarify What's Included: Ensure your quote explicitly states all aspects of the job, including materials, labor, site preparation, and cleanup, to avoid hidden costs or misunderstandings later on.
